Post-tension cable flags in Red Deer condo data.
The export includes a post-tension yes/no field. A yes flag is not automatically a deal-breaker, but it is a clear due-diligence item.
Imported post-tension distribution
No
2,892
Yes
64
Unmapped
6
The current export explicitly flags 64 of 2,962 rows as yes. That is a field observation, not an engineering conclusion.
What the flag means for the next question
- Is there a post-tension cable report or engineer guidance?
- Are there drilling, coring, renovation, or flooring restrictions?
- Does the reserve fund plan account for required inspections or repairs?
- Has the building had prior cable-related work, leaks, or structural review?
- Which areas are affected, and who must approve future work?
What a yes flag does not tell you
It does not tell you that a building is unsafe, that a repair is required, or that a particular unit has a defect. It tells you to ask for the governing technical and condominium records before renovation or purchase decisions.
Professional review: post-tension questions should be reviewed through condo documents, engineering records, and qualified professionals. This page only summarizes the imported Matrix flag.